1
/
of
22
WBS0030 Stainless Steel Cola Shape Vacuum Insulated Bottle for Sports - 500ml
WBS0030 Stainless Steel Cola Shape Vacuum Insulated Bottle for Sports - 500ml
Regular price
$21.99
Regular price
Sale price
$21.99
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
- Code: WBS0030
- Drinkware Category: Water Bottle
- Drinkware Type: Stainless Steel Bottle
- Material: 304 Stainless Steel.
- Capacity: 500ml
- Size: 24.5*7cm
- Accessories:
- Color: Silver, White, Cyan, Blue, Fuchsia, Red, Yellow, Rose Gold, Gold, Black, Green
- Design Style: Classic
- Water Flowing Method: Direct Drinking
- Thermal Insulation Performance: 12-24 hours
- Anti-corrosion Coating: Equipped
- Boiling Water: Applicable
- Suitable for: Adults
- Outdoor Activity:
- Occasion:
- Features: 1. The powder coated exterior finish is classic. It ensures that you stand out and have a very durable and elegant bottle. 2. This vacuum flask is made of durable stainless steel inside and outside and is durable. 3. Sports bottle, double layer insulation, it keeps your drink warm for up to 12 hours. 4. Made of 304 stainless steel, BPA-free and non-toxic. It will never leave a metallic smell or rust. 5. Unique double-wall vacuum insulation technology to better maintain temperature.
- Notes: Please allow 1-3mm differences due to manual measurement, thank you! 2. Due to the difference between different monitors, please understand that the picture may not reflect the actual color of the item.
Share
