1
/
of
9
FEIJIAN Stainless Steel Double Walled Portable Bottle for Sports - Ultralight and Popular for Climbing, Hiking, Running - 600ml - WBS0015
FEIJIAN Stainless Steel Double Walled Portable Bottle for Sports - Ultralight and Popular for Climbing, Hiking, Running - 600ml - WBS0015
Regular price
$23.98
Regular price
Sale price
$23.98
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
- Code: WBS0015
- Drinkware Category: Water Bottle
- Drinkware Type: Stainless Steel Bottle
- Material: Stainless Steel.
- Capacity: 450ml, 600ml
- Accessories: With Lid
- Color: Blue, Green, White
- Design Style: Modern
- Water Flowing Method: Direct Drinking
- Thermal Insulation Performance: Applicable
- Anti-corrosion Coating: Equipped
- Boiling Water: Applicable
- Suitable for: Unisex
- Outdoor Activity: Camping, Hiking, Travel, Sport
- Occasion:
- Features: 1. KEEP COLD AND HOT - FEIJIAN sports water bottle is engineered to be double wall insulated, keep your drinks perfectly chill or hot. Keep drink hot for 12 hours and cold for about 24 hours. 2. AUTOSEAL - One hand operated AUTOSEAL button keeps your hand free when driving, riding, running, ensures replenishing water timely. Ideal for gym, yoga, runners, athletes, travel, hiking, cycling, tennis, camping & office work. 3. LEAK PROOF AND SWEAT PROOF - flip top lid seals strongly between sips. This hydration water bottle will never make your clothes, bags, books and desks wet. You do not need to worry about leakage anymore! 4. ORIGINAL DESIGN - Powder coating makes bottle anti-slip and more dynamic. The flip top with handle makes your bottle easy to carry. Suit for all kinds of car cup holder. 5. PREMIUM STAINLESS STEEL: Medical grade 18/10 stainless steel inside and food grade 18/8 outside walls. 100% BPA-free. It is easy to grip and a finger-print free texture that is easy to clean, recyclable, reusable.
- Notes: Please allow 1-3mm differences due to manual measurement, thank you! 2. Due to the difference between different monitors, please understand that the picture may not reflect the actual color of the item.
Share
