1
/
of
23
Stainless Steel Double Wall Thermal Flask Thermos, 700ml - WBS0011
Stainless Steel Double Wall Thermal Flask Thermos, 700ml - WBS0011
Regular price
$20.96
Regular price
Sale price
$20.96
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
- Code: WBS0011
- Drinkware Category: Water Bottle
- Drinkware Type: Stainless Steel Bottle
- Material: 304 Stainless steel.
- Capacity: 700ml
- Accessories: Vacuum
- Color: Black, White, Grey, Red, Green, Blue, Orange
- Design Style:
- Water Flowing Method: Direct Drinking
- Thermal Insulation Performance: 12-24 hours
- Anti-corrosion Coating: Applicable
- Boiling Water: Applicable
- Suitable for: All
- Outdoor Activity: School, Travel, Picnic, Office
- Occasion: Back to School, Business Gift
- Notes: 1. Please allow 1-3mm differences due to manual measurement, thank you! 2. Due to the difference between different monitors, please understand that the picture may not reflect the actual color of the item.
Share
